17
Installer Checklist to be completed by
installer upon installation
Serial Number
(8 digit serial number is located
on rating plate on right side
panel)
1)
Gas Pressure Reading
Static
Operating
Water Pressure
Building Water Pressure
Range if on Well system
Installing Company
Installer name
Address
Phone
Table 46
1) See Chapter 4.14, page 31 and gas pressure table (to be filled out by installer)
Installation manual should be left with the owner after
the installation is tested and completed.
C 1210 ES/ESC
___ ___ ___ ___ ___ ___ ___ ___
Installer Checklist to be completed by installer upon installation | 63
6 720 644 887 (2013/02)