Western Shelter Systems WS-VC-CBTA Quick Start Manual page 6

Vehicle connector boot

Advertisement

D. ERECTING THE TRAILER BOOT
1. Frame Assembly
Position trailer roughly 10 feet away from
Ø
shelter, centered with a door or wall
split. The trailer may be moved for final
positioning after framework is fully erected.
Peel the walls away from the shelter door or
Ø
wall split all the way back to the first leg on
each side.
Remove the door, base bar and eave bar
Ø
from the side of the shelter where the
Trailer Boot will connect.
Place the two folding frame sections 5
Ø
feet apart with the straight receiver blocks
facing each other.
Place the eave bars and the ridge bar
Ø
between the folding frame sections. Attach
the eave bars and ridge bar to the outer
blocks with the hook and loop material on
the eave bars facing out.
Starting on one side of an eave bar, fold
Ø
out the legs to the left and the right of the
eave bar, and lock them into place with the
attached pins.
6
Install the two base bars on the unfolded
Ø
legs and the end base bar between the legs
closest to the trailer.