DUCT WORK

All duct work must be properly sized for the design
airflow requirement of the equipment. Air Conditioning
Contractors of America (ACCA) is an excellent guide
to proper sizing. All duct work or portions thereof not
in the conditioned space should be properly insulated in
order to both conserve energy and prevent condensation
or moisture damage. When duct runs through unheated
spaces, it should be insulated with a minimum of one
inch of insulation. Use insulation with a vapor barrier
on the outside of the insulation. Flexible joints should
be used to connect the duct work to the equipment in
order to keep the noise transmission to a minimum.
The Q-T
series unit has provision to attach a supply
ec
air duct to the top of the unit. Duct connection size is
12 inches x 20 inches. The duct work is field supplied
and must be attached in a manner to allow for ease of
removal when it becomes necessary to slide the unit out
from the wall for service. See Figure 7 for suggested
attachment method.
The Q-T
series units are designed for use with free
ec
return (non-ducted) and either free blow with the use of
QPB Plenum Box or a duct supply air system.
The QPB and QPBHW Plenum Box mounts on top
of the unit and has both vertically and horizontally
adjustable louvers on the front discharge grille.
For hot water coil option a QPBHWxx-F for free blow
or QPBHWxx-D for ducted airflow is used.
FIGURE 7
SUPPLY DUCT CONNECTIONS
ROOM SIDE OF
Q-T
UNIT
ec
NOTE: Unit cabinet, supply air duct and free blow
plenum are approved for "0" clearance to
combustible material.
When used with a ducted supply, a QCX Cabinet
Extension can be used to conceal the duct work above
the unit to the ceiling. This extends 20" above the
unit for a total height above the floor of 10'-7/8". The
unit is equipped with a variable speed indoor blower
motor which increases in speed with an increase in duct
static pressure. The unit will therefore deliver proper
rated airflow up to the maximum ESP shown in Table
8. However, for quiet operation of the air system, the
duct static should be kept as low as practical, within the
guidelines of good duct design.

FILTERS

Two 1-inch throw away filters [(1) 16x16 and (1)
16x20] are supplied with each unit. The filters slide
into filter brackets. Refer to Figure 8.
The filters are serviced from the inside of the building
by opening the hinged door. This door is attached by
T-25 Torx screws and one locking latch.
The internal filter brackets are adjustable to
accommodate 2-inch filters. The tabs for the 1-inch
filters must be bent down to allow the 2-inch filters to
slide in place.
SUPPLY DUCT
TO BE FIELD
SUPPLIED
ATTACHMENT
SCREWS TO
BE FIELD
SUPPLIED
DUCT FLANGE
RETURN AIR
PROVIDED WITH
GRILLE
UNIT
FIGURE 8
FILTER LOCATION
FILTERS