Electrical System Carried Out By The Factory - Riello BS2D Installation, Use And Maintenance Instructions

Forced draught gas burners
Table of Contents

Advertisement

Available languages

Available languages

5.11.1 Electrical system carried out by the factory

Master
switch
230V ~ 50Hz
Key to layout
B5
Signal 2nd stage operating
C
Capacitor
CN1
Probe connector
E
Electrode
h..
Hour counter
MV
Motor
PA
Minimum air pressure switch.
PG
Minimum gas pressure switch
RS
Remote reset
SM
Air damper servomotor
SO
Ionisation probe
S3
Lockout signal (230V - 0.5A max.)
T6A
Fuse
TB
Burner earth
TL
Heat request thermostat
TR
Adjustment thermostat 1st and 2nd stage
TS
Safety thermostat
V10
Safety valve
V11
1st stage valve
V12
2nd stage valve
X..
Plug
XP..
Socket
Installation
Blue
 Do not invert the neutral with the phase in the
 Check that the electrical supply of the burner
WARNING
 The section of the conductors must be at
 Connect the 2nd stage thermostat (TR) to the
Check the burner stops by opening the thermo-
stats and check it locks out by opening the con-
nector (CN1) (Fig. 18) inserted in the probe's red
wire, located on the outside of the control box.
WARNING
If the cover is still on, remove it and proceed with
the electric wiring following the wiring diagrams.
Use flexible cables in compliance with EN 60 335-
CAUTION
1 standards.
23
GB
Brown
Black
CARRIED OUT
IN THE FACTORY
TO BE DONE BY
BY THE INSTALLER
D4627
electrical supply line.
corresponds to that shown on the identifica-
tion label and in this manual.
2
least 1mm
. (Unless requested otherwise by
local standards and legislation).
terminals T6 - T8 removing the jumper.
Fig. 18
20135737

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Bs1dBs3dBs4d915t1916t1917t1 ... Show all

Table of Contents