Preparation
Pressure Relief Procedure
Follow the Pressure Relief
Procedure whenever you see this
symbol.
This equipment stays pressurized until
pressure is manually relieved. To help
prevent serious injury from pressurized
fluid or splashed fluid follow the Pressure
Relief Procedure whenever sprayer is
stopped and before sprayer is cleaned or
checked, and before equipment is
serviced.
1.
Turn ON/OFF switch to the OFF
position. Wait 7 seconds for power to
dissipate.
ti27340a
3A7026A
2.
Trigger gun into material hopper.
3.
Open air control valve.
4.
Open gun prime valve.
Preparation
ti27341a
5