3. Attach gas line to fireplace gas regulator.
See Connecting to Gas Supply, page 14.
4. Check all gas connections for leaks. See
Checking Gas Connections, page 16.
IMPORTANT: When finishing your firebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the firebox. Combustible materials
should never overlap the firebox front.
CAUTION: Do not operate
fireplace without hood in place.
1. Align 3 holes in upper side of hood with
holes in heat insulation board (see Fig-
ure 11).
2. Insert screwdriver through hole in top fire-
box panel to secure hood to heat insulation
board with 3 screws (see Figure 11).
200241-01E
INSTALLATION
Figure 10 - Rough Opening for Corner
INSTALLING HOOD
Hood
Top
Firebox
Panel
www.usaprocom.com
35"
56
/
"
1
4
Installation
Top of Firebox
Figure 11 - Hood Installation
28
/
"
1
8
Heat
Insulation
Board
13