Elbow Dimensions; Equivalent Length Of Fittings; Combustion Air Intake And Vent Connection Size At Furnace (All Models) - Johnson Controls York International TM9X Series Installation Manual

Single stage ecm residential gas furnaces
Hide thumbs Also See for York International TM9X Series:
Table of Contents

Advertisement

A
STANDARD ELBOW
FIGURE 25: Elbow Dimensions
TABLE 9: Elbow Dimensions
Elbow
"A" Dimension (Illustrated in Figure 25)
2" Standard
3" Standard
2" Sweep
3" Sweep
Dimensions are those required in Standard ASTM D-3311.
TABLE 10: Equivalent Length of Fittings
Fitting
2" 90° sweep elbow
2" 45° sweep elbow
2" 90° standard elbow
2" 45° standard elbow
3" 90° sweep elbow
3" 45° sweep elbow
3" 90° standard elbow
3" 45° standard elbow
4" 90° elbow (sweep or standard)
4" 45° elbow (sweep or standard)
2" corrugated connector
3" corrugated connector
4" corrugated connector
Example:
An 80,000 BTUH furnace requires 32 feet of pipe and five 90º elbows.
Using 2" pipe and standard elbows, the total equivalent length will be:
32 feet of 2" pipe =
5 - 90º standard 2" elbows = (5 x 7) =
Total =
This exceeds the 65 foot maximum equivalent length of 2" pipe allowed
for that model and is thus not acceptable.
By using sweep elbows, the total equivalent length will be:
32 feet of 2" pipe =
5 - 90º sweep 2" elbows = (5 x 5) =
Total =
This is less than the 65 foot maximum equivalent length of 2" pipe
allowed for that model and is thus acceptable.
Alternatively, using 3" pipe and standard elbows, the total equivalent
length will be:
32 feet of 3" pipe =
5 - 90º standard 3" elbows = (5 x 7) =
Total =
This is less than the 90 foot maximum equivalent length of 3" pipe
allowed for that model and is thus acceptable.
Johnson Controls Unitary Products
A
LONG (SWEEP) ELBOW
2-5/16"
3-1/16"
3-1/4"
4-1/16"
Equivalent Length
5 feet of 2" pipe
2-1/2 feet of 2" pipe
7 feet of 2" pipe
3-1/2 feet of 2" pipe
5 feet of 3" pipe
2-1/2 feet of 3" pipe
7 feet of 3" pipe
3-1/2 feet of 3" pipe
5 feet of 4" pipe
2-1/2 feet of 4" pipe
10 feet of 2" pipe
10 feet of 3" pipe
10 feet of 4" pipe
32 equivalent feet
35 equivalent feet
67 equivalent feet of 2" pipe
32 equivalent feet
25 equivalent feet
57 equivalent feet of 2" pipe
32 equivalent feet
35 equivalent feet
67 equivalent feet of 3" pipe
TABLE 11: Combustion Air Intake and Vent Connection Size at Furnace
(All Models)
FURNACE VENT CONNECTION SIZES
Furnace Input
Intake Pipe Size
Vent Pipe Size
Furnace vent pipe connections are sized for 2î (5.1 cm). pipe. Any
pipe size change must be made outside the furnace casing in a verti-
cal pipe section to allow proper drainage of condensate. An offset
using two 45∫ (degree) elbows will be required for plenum clearance
when the vent is increased to 3î (7.6 cm).
Accessory concentric vent / intake termination kits 1CT0302 and
1CT0303, and for Canadian applications 1CT0302-636 and
1CT0303-636 are available and approved for use with these fur-
naces. Horizontal sidewall vent terminations kits 1HT0901 &
1HT0902 are also approved for use with these furnaces.
COMBUSTION AIR AND VENT PIPING ASSEMBLY
The final assembly procedure for the combustion air and vent piping is
as follows:
1. Cut piping to the proper length beginning at the furnace.
2. Deburr the piping inside and outside.
3. Chamfer (bevel) the outer edges of the piping.
4. Dry-fit the vent piping assembly from the furnace to the outside ter-
mination checking for proper fit support and slope.
5. Dry-fit the combustion air piping assembly checking for proper fit,
support and slope on the following systems:
a.
Sealed combustion air systems from the furnace to the out-
side termination.
b.
Ventilated combustion air systems from the furnace to the
attic or crawl space termination.
Solvent cements are flammable and must be used in well-ventilated
areas only. Keep them away from heat, sparks and open flames. Do
not breathe vapors and avoid contact with skin and eyes.
6. Disassemble the combustion air and vent piping, apply cement
primer and the cement per the manufactures instructions. Primer
and cement must conform to ASTM D2564 for PVC, or ASTM
D2235 for ABS piping.
7. All joints must provide a permanent airtight and watertight seal.
8. Install the combustion air and vent piping such that it has a 1/4" per
foot (21 mm/m) grade so that condensate flows back toward the fur-
nace. Piping should be supported with pipe hangers to prevent sag-
ging.
9. Seal around the openings where the combustion air and / or vent
piping pass through the roof or sidewalls.
COMBUSTION AIR / VENTING
The vent must be installed with the minimum required clearances,
and must comply with local codes and requirements.
1083288-UIM-A-0114
All
2" (5.1 cm)
2" (5.1 cm)
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents