Jacuzzi J-100 Owner's Manual page 18

Hide thumbs Also See for J-100:
Table of Contents

Advertisement

J-100
8. Connect wires, color to color, on terminal blocks TB1 and TB3
(Figure C, page 15). TIGHTEN SECURELY! All wires must be
hooked up securely or damage could result.
9. Install control box door and screws and reinstall the cabinet side
panels.
5
2
Note: Equipment location (such as pumps, drain, heater etc.) varies by model.
1. Control Box
2. Power Supply Inlet(s)
3. 2-Speed Pump
4. Heater
2
14
Figure A
Equipment Area
4
6
Figure B
Control Box
TB1
1
3
7
1
3
5.
Pump Drain Plug
6.
1-Speed Pump
7.
Control Panel
1. Terminal Block
2. Bonding Lug
3. Grounding Terminal
5
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents