Download Print this page
MPK VisionStar L pro LED Installation And Operating Instructions

MPK VisionStar L pro LED Installation And Operating Instructions

Rooflight with pleated blind and net for installation in caravans and mobile homes

Advertisement

Quick Links

Rooflight with pleated blind and net
for installation in caravans and mobile homes
VisionStar L pro
EN
Installation and Operating Instructions
Please read the instructions carefully before installing the rooflight and store
it for future.
We cannot be held responsible for incorrect fitting, handling or operation.
Any product faults relating to the production and materials used should be notified to us via
an authorised dealer immediately.
1
Plastikverarbeitung GmbH & Co. KG
Friedrich-Ebert-Str. 298-300
LED
Technical data:
Aperture
Roof thickness
Corner radius
Site dome
Height over roof
Ventilation
Weight
Size inner frame
872 x 610 x 37 mm
Outer frame material
Dome material
Speed limit: inst. transverse
inst. lenghtways
Authorization
ECE R43 -019651
LED-light
575 x 9 x 2,5 mm
Light color
~ 3000 K (warm white)
Energy efficiency class
Nom. useful liminous flux
Voltage
Condumption
2 x 5,6 kW/h / 1000h
Nominal lifetime
No. of switching cycles
Warm up time
Nominal beam angle
Included with delivery
1x Rooflight with outer frame
1x Inner frame with LED, polyswitch fuse, connection cable
1x Fixing parts (14 St. fixing brackets, 4 St. large plastic screw)
MPK Metall- und
Additionally required for installation (not included in delivery)
1x Elastic sealant adhesive, e.g. Dekalin Dekaseal 8936 or SikaLastomer®-710
D-58566 Kierspe
14x Fixing screws for the upper frame
mpk-kierspe.de
Pan 3,5 mm / head according to DIN ISO 7049 (DIN 7981) / The length of the screw should
be determined by the roof thickness, plus approximately 10 mm for the screw to enter the
upper frame.
With timber support under the roof lining:
4x Fixing screws for the inner frame:
700 x 500 mm
Pan 3,5 mm / head according to DIN ISO 7049 (DIN 7981) / length max. 10 mm
25 bis 60 mm
Explanation of symbols
23 mm
NOTE
815 x 583 mm
Particulary important information.
105 mm
0 bis 150 cm²
ATTENTION!
Failure to observe can lead to material damage.
8,4 kg
WARNING!
Polypropylene
Safety note: Serious risk of injury.
Polycarbonate
Safety and installation instructions
160 km/h
130 km/h
Check the roof thickness of your vehicle before mounting.
The rooflight should only be fitted to a flat roof surface, both internally and
externally.
Choose a fitting position that will not interfere with other roof mounted components
(e.g. roof-racks/antenna's etc.) and avoid internally installed electrical cables and
A+
furniture, which could impede the correct operation of the rooflight.
2 x 500 lm
12 -14V DC
10.000h
50.000
<1sek.
60°
Make sure that there is a suitable supply line and switch for the lighting in the vehicle.
We recommend installation with the hinge side in the direction of travel. In the
caravan, the rooflight can alternatively be fitted with hinges to the right/left side of the
vehicle, provided the rooflight is not fitted to the front edge of the vehicle roof.
Never stand on the dome of the rooflight!
Do not open the rooflight while driving. The rooflight must be locked down before
traveling.
Do not open the rooflight in strong wind or rain.
Close the rooflight during rain and snowfall.
Inner frame
Issue 01.2021

Advertisement

loading
Need help?

Need help?

Do you have a question about the VisionStar L pro LED and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for MPK VisionStar L pro LED

  • Page 1 1x Inner frame with LED, polyswitch fuse, connection cable 1x Fixing parts (14 St. fixing brackets, 4 St. large plastic screw) MPK Metall- und Plastikverarbeitung GmbH & Co. KG Additionally required for installation (not included in delivery) Friedrich-Ebert-Str.
  • Page 2 Version 1: Timber support under the roof lining Installation Offer up the inner frame into the outer frame. Use the four small Var.1 Please clean the frames carefully before mounting the holes to fix the inner frame with standard screws into the timber sealant.
  • Page 3 This makes the extension mechanism glide more easily. The rubber seals can be maintained with talcum powder. Pay attention that the pins positively click into the locked position when re-installing the dome. mpk-kierspe.de/Downloads The lever arm pins should be re-installed with the flat side towards the dome. Issue 01.2021...