Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
•
•
•
•
•
•
•
6. Opening the boiler door..................................................................................................... 12
•
•
•
•
8. Checking the gaskets and packing cords on the flue gas side
•
•
•
•
•
•
•
•
12. Checking connections and sensor well on the heating water side for tightness
•
•
•
•
•
•
•
•
•
used (DCC system)............................................................................................................ 15
•
•
•
•
•
•
17. Checking the firm seating of electrical plug-in connections and cable grommets
•
•
•
•
•
•
•
•
•
replacing used agent
•
•
•
•
•
•
•
•
•
•
•
•
26. Checking the flue pipe and all connections from the heat exchanger to the flue
system for tightness.......................................................................................................... 19
•
•
•
•
28. Adjusting the burner.......................................................................................................... 20
•
•