Hauling The Tractor And Implement - Bush Hog RMB 1865 Operator's Manual

Rear mount boom mower
Hide thumbs Also See for RMB 1865:
Table of Contents

Advertisement

Reduce speed before turning or applying the brakes.
Ensure that both brake pedals are locked together
when operating on public roads. OPS-U- 0023
When transporting Boom Mower on a truck or trailer, the height or width
may exceed legal limits when the boom is in the transport position.
Contact with side or overhead structures or power lines can cause
property damage or serious injury or death. If necessary lower boom to
reduce height and/or remove mowing head to reduce width to the legal
limits.
(SBM-8)

20.2 Hauling the Tractor and Implement

Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through. OPS-U- 0024
RMB 1865 11/10
© 2010 Alamo Group Inc.
OPERATION
Operation Section 4-42

Advertisement

Table of Contents
loading

Table of Contents