•
Operate "REACH IN" until dipper arm contacts
the transport cradle.
•
Select "LIFT UP" and raise the arms until the
tension link is 300mm from the tractor cab.
•
Operate "ANGLE" and position the flail head in
as compact position as possible. (see transport
position)
•
Fully screw in the lift ram and slew ram taps.
RMB 1865 11/10
© 2010 Alamo Group Inc.
OPERATION
Operation Section 4-38