Please read this manual carefully before installation.
This appliance is filled with R32.
Keep this operation manual for future reference.
0011500248
ROOM AIR CONDITIONER
INSTALLATION MANUAL
1U09JABFRA
1U12JABFRA
1U18RAAFRA
1U26JABFRA
1U35JABFRA
1U53RAAFRA

Advertisement

Table of Contents
loading

Summary of Contents for Haier 1U09JABFRA

  • Page 1 ROOM AIR CONDITIONER INSTALLATION MANUAL 1U26JABFRA 1U09JABFRA 1U35JABFRA 1U12JABFRA 1U18RAAFRA 1U53RAAFRA Please read this manual carefully before installation. This appliance is filled with R32. Keep this operation manual for future reference. 0011500248...
  • Page 2: Table Of Contents

    Contents Warning ..........................1 Loading and Unloading/Transporting Management/Storage Requirements......3 Installation Instructions......................3 Relocation Procedures......................7 Maintenance Instructions......................7 Scrapping and Recovery......................10 Indoor/Outdoor Unit Installion Drawings.................. 12 Safety Precautions ........................13 Read Before Installation ........
  • Page 3: Warning

    Read the precautions in this manual This appliance is filled with R32. carefully before operating the unit. Keep this manual where the user can easily find it. WARNING: Ask your dealer or qualified personnel to carry out installation work.Do not attempt to install the air conditioner yourself.
  • Page 4 CAUTION : Do not install the air conditioner at any place where there is danger of flammable gas leakage. In the event of a gas leakage, build-up of gas near the air conditioner may cause a fire to break out. Tighten the flare nut according to the specified method such as with a torque wrench.If the flare nut is too tight, it may crack after prolonged use, causing refrigerant leakage.
  • Page 5: Loading And Unloading/Transporting Management/Storage Requirements

    Loading and Unloading/Transporting Management/Storage Requirements The products shall be carefully handled during loading and unloading. Do not give impact to the indoor and outdoor units, or otherwise product damage may result. Be sure to read the safety cautions before conducting any work. Dry powder extinguishers or other suitable fire extinguishing apparatus should be equipped at the loading area.
  • Page 6 Procedures: operation shall be made as per controlled procedures to minimize the probability of risks. Area: area shall be divided and isolated appropriately, and operation in an enclosed space shall be avoided. Before the refrigeration system is started or before hot working, ventilation or opening of the area shall be guaranteed.
  • Page 7 Electrical Safety Requirements Note: The surrounding conditions (ambient temperature, direct sunlight and rainwater) shall be noticed during electrical wiring, with effective protective measures being taken. Copper wire cable in line with local standards shall be used as the power line and connector wire. Both the indoor unit and outdoor unit shall be reliably earthed.
  • Page 8 Fixation The support of the outdoor unit shall be fixed onto the wall surface, and then the outdoor unit shall be fixed onto the support horizontally. In case the outdoor unit is wall-mounted or roof-mounted, the support shall be firmly fixed, to avoid the damage of strong wind.
  • Page 9: Relocation Procedures

    Relocation Procedures Note: in case relocation is required, the joint of evaporator gas/liquid pipes of the indoor unit shall be cut off with a cutting knife. Connection is only allowed after re-flaring (the same to the outdoor unit). Maintenance Instructions Maintenance Precautions Precautions For all the faults requiring welding the refrigeration pipelines or components inside the refrigeration system...
  • Page 10 Inspection on Maintenance Environment Before operation, the refrigerant leaked in the room is not allowed. The area of the room in which maintenance is made shall be in line with the nameplate. Continuous ventilation shall be maintained during maintenance. Open fire or high-temperature heat source higher than 548 degree which can easily give birth to open fire is not allowed inside the room within the maintenance area.
  • Page 11 Maintenance Items Maintenance Requirements Before the refrigeration system is operated, the circulating system shall be cleaned with nitrogen. Afterwards, the outdoor unit shall be vacuumized, the duration of which cannot be less than 30 minutes. Finally, 1.5~2.0MPa OFN shall be used for nitrogen flushing (30 seconds~1 minute), to confirm the position requiring treatment. Maintenance of the refrigeration system is only allowed after the residual gas of flammable refrigerant is removed.
  • Page 12: Scrapping And Recovery

    Removal and Vacuumizing The maintenance or other operations of the refrigeration circuit shall be made as per conventional procedures. Moreover, the flammability of refrigerant shall also be mainly considered. The following procedures shall be followed: Refrigerant clearing; Pipeline purification with inert gas; Vacuumizing;...
  • Page 13 In case the vacuum state cannot be reached, vacuumizing shall be carried out from numerous positions, to pump the refrigerant in each part of the system out; It shall be guaranteed that the capacity of cylinders is sufficient before recovery; The recovery equipment shall be started and operated as per the operation instructions of the manufacturer;...
  • Page 14: Indoor/Outdoor Unit Installion Drawings

    Indoor/Outdoor Unit Installation Drawings The models adopt CFC free refrigerant R32. For installation of the indoor units,refer to the installation manual which was provided with the units. (The diagram shows a wall-mounted indoor unit.) The height when the panel rises is 48mm. Attention must be paid to the rising up of drain hose more than 20cm...
  • Page 15: Safety Precautions

    fire or explosion. fire or explosion. , fire or explosion will be caused. fire or explosion. , fire or explosion. ,fire,explosion.
  • Page 17 WARNING CAUTION Open the window and well ventilated the room explosion-proof fuse...
  • Page 18 Install a explosion-proof breaker for current leakage at the power source to avoid the risk of the electric shock. Without a breaker for current leakage will cause risks of electric shock, fire or explosion. Do not use large-capacity fuses,steel wire,or copper wire. Damaging the unit ,fire,smoke or explosion will be caused otherwise.
  • Page 21 410A...
  • Page 22: Installation Procedure

    Air outlet Wind direction Cushion rubber 4.Installation dimension(Unit:mm) 114.2 114.2 Floor fixing dimensions of the outdoor unit 2.6 & 3.5 kW 108mm (Unit:mm) 1U09JABFRA 1U18RAAFRA 1U12JABFRA 1U53RAAFRA 1U26JABFRA 1U35JABFRA 5.3 kW 138mm 222mm...
  • Page 23 FOR 2.6 & 3.5 kW FOR 5.3kW Connection of pipes When bending the pipe, be careful not to crush it. To prevent breaking of the pipe, avoid sharp bends. Bend the pipe with a radius of curvature of 40 mm or over. Connecting the pipe of gas side rst makes working easier.
  • Page 25 (R32) (R32)
  • Page 26 1U26JABFRA 1U35JABFRA 1U53RAAFRA ceramic type of AC 250V, T25A. local The explosion-proof breaker of the air conditioner should be all-pole switch. The distance between its two contacts should not be no A explosion-proof breaker must be installed. Power cable: -mod:09-18:3G2.5mm² 4G1.5mm²...
  • Page 27: Outdoor Unit Troubleshooting

    Outdoor Unit When the The wiring of compressor is wrong or Suction temperature sensor failure the connection is poor Lack of refrigerant Check if there is leakage in the unit.
  • Page 28 For Haier Appliances Australia 1300 729 948 | haier.com.au New Zealand 0800 424 372 | haier.co.nz Important notice of Disclosure: Copyright © Fisher & Paykel Appliances 2019. All rights reserved. models described at the date of issue. Under our policy of continuous product improvement, these Fisher &...