2. Attach open end of floating link (3) to the bottom
hole of A-frame bars (5). Secure using cap screw
(11), sleeve (10), and flange lock nut (9).
3. Attach closed end of floating link (3) to diagonal
braces (6). Secure using cap screw (8), spacer (7),
and flange lock nut (9) supplied in hardware bag.
NOTE: Quick hitch top hook will pick up on sleeve
(10). Lower quick hitch hook will attach to cutter
hitch pins.
4. Raise cutter to transport position and adjust tractor
top link until cutter is level in the raised position.
INSTALLATION AND REMOVAL
OF DRIVELINE (TRACTOR PTO)
To Install:
Pull locking collar back and at the same time push driv-
eline onto tractor PTO shaft until locking device
engages.
6
9
Standard Hitch Configuration
10 Operation
6
11
7
5
3
5
3. Floating link
5. A-frame
6. Diagonal braces
7. 1/2 x 2-3/4 Spacer
Figure 4. Standard Hitch and Quick Hitch Configuration
To Remove:
Hold driveline into position, pull locking collar back, and
slide driveline off tractor PTO shaft.
Figure 3. Lock Collar
Quick Hitch Configuration
7
6
9
5
8. 1/2 NC x 4 Cap screw
9. 1/2 NC Flange lock nut
10. 1/2 x 3/4 x 2-13/16 Sleeve
11. 1/2 NC x 5 Cap screw
6
8
11
5
10
3
CD6316
(Rev. 12/2/2005)
MAN0050 (Rev. 8/19/2005)
10