Replacement
4.50 Vibrator
Follow the 3.1 and 3.2 Disassembly instructions!
Carry out the Removal as described below!
Prepare a new Vibrator
Follow the 4.9 and 4.31 Installation instructions!
Carry out the Installation as described below!
Follow the 5.5 and 5.6 Reassembly instructions!
REMOVAL
Use the Front Opening Tool to remove the BtB connector
from the PBA Complete and loosen the wire from the Vibrator
Adhesive.
Do not damage the components on the PBA Complete!
Use the Dentist hook to remove the Vibrator.
Secure placement of Dentist hook according marked
cavity in picture!
INSTALLATION
Twist the wires 5 turns.
Place the Vibrator in the bottom right cavity on the Front
Assy.
Attach the BtB connector to the PBA Complete and position
the wires on the Adhesive Vibrator Wire
Secure it with your fingers.
1271-7733 Rev 2
Sony Mobile Communications AB – Company Internal
.
Working Instruction (mech)
63(76)