Pictured are the (2) example PWBs that will be used in this procedure
This is a quick and simple procedure that can be used to quickly test the circuits operation.
Ensure you have properly inspected the PWB for Shorted, Open, Damaged or Missing components.
The Steps of the Procedure are as follow:
1.
Remove PWB from Television
2.
Inspect PWB for Shorted, Open, Damaged or Missing components.
3.
Ensure Main Power Switch is Closed (Shorted) to allow AC in circuit
4.
Plug unit into AC line to provide voltage to Standby VCC circuits.
5.
Test Standby Circuits and Check "Standby" Operation of Switching Circuits.
6.
Simulate or Activate Micon "Power On" signal to activate Main Power Circuits.
7.
Check "Power On" function of Switching Circuits.