4.2.1. Lifting the MONO unit
The machine must be lifted slowly and well leveled. Always use
protective devices to prevent damage to the belt and note the position
of the unit's centre of gravity. Adjust the lifting equipment if necessary
to ensure that the unit is levelled.
N.B.: Follow the lifting instructions provided in the ID plate fastened to
the electrical panel.
Figure 1 – Lifting the MONO unit
DEIMHP0140521_00EN
8
4.2.2. Lifting the DUAL unit
Figure 2 – Lifting the DUAL unit
4.3. Positioning and assembly
All units are designed for installation outdoors, either on balconies or
on the ground, provided that the installation area is free of obstacles
that could reduce air flow to the condensers coil.
The unit must be installed on a robust and perfectly level foundation;
should the unit be installed on balconies or roofs, it might be
necessary to use weight distribution beams.
For installation on the ground, a strong concrete base, at least 150
mm thickness and wider than the unit must be provided. This base
must be able to support the weight of the unit. In heavy snowfall
areas, this thickness should be increased,
The frame of the unit must be levelled using metal plate spaces.
The base can be installed both longitudinally or transversely. In the
following figure are illustrated the mounting holes location.
EWYT~CZ / EWAT~CZ