FoxESS T Series Quick Installation Manual

FoxESS T Series Quick Installation Manual

Hide thumbs Also See for T Series:

Advertisement

Quick Links

T SERIES
Quick Installation Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FoxESS T Series

  • Page 1 T SERIES Quick Installation Guide...
  • Page 2 T SERIES Packing List Object Quantity Description Object Quantity Description Inverter Expansion screw Bracket Communication connector 2/3/4 DC connector (F/M) Product manual AC connector Quick installation guide DC pin contact 2/3/4 WiFi/GPRS (Optional) (1*positive, 1*negative) Earth terminal Expansion tube...
  • Page 3 T SERIES Inverter Installation Please make sure the inverter will be installed with a proper distance as shown below. Position Min Size Left 30cm Right 30cm 30cm Bottom 30cm Front 30cm Step 1: Fix the bracket on the wall Choose the place you want to install the inverter.
  • Page 4 T SERIES Insert the expansion tubes into the holes and tighten them. Install the bracket with the expansion screws. Step 2: Match the inverter with wall bracket Hang the inverter over the bracket, slightly lower the inverter, and make sure the 2 mounting bars on the back are properly fixed with the 2 bracket grooves.
  • Page 5 T SERIES Trim all the wires to 52.5mm and the PE wire to 55mm. Use the crimping pliers to trim 12mm of insulation from all wire ends as shown in the picture.  Separate the AC plug into three parts as below.
  • Page 6 T SERIES  Insert the plug assembly into the socket (inverter end) and lock each other by the coupling twist. DC Wiring  Turn off the DC switch.  Choose 12 AWG wire to connect the PV module.  Trim 6mm of insulation from the wire end.
  • Page 7 T SERIES  Crimp pin contact by using a crimping plier. Put the pin contact with striped cable into the corresponding crimping pliers and crimp the contact.  Insert pin contact through the cable nut to assemble into back of the male or female plug.
  • Page 8 T SERIES Startup Procedure -After checking all connections are correct, turn on the external DC /AC breakers. -Tum the DC switch to “ON” position. -lnverter will start automatically when PV panels generate enough energy. The LED will be green and the LCD screen will display the main interface.

This manual is also suitable for:

T3T4T5T6T8T10 ... Show all

Table of Contents