NBK EPC-200-CC Instruction Manual page 22

Transceivers - cc-link compliant
Table of Contents

Advertisement

4
Installation and Connections
Installation of CC-Link Connector
② Screws
① Connector
Connecting the CC-Link Connector to Lead Wire
① Lead wire
② Orange button
10mm 
(0.394 in.)
21
1
Insert the ① Connector into the
transceiver.
2
Tighten the two ② Screws with a
flathead screwdriver.
(Recommended tightening torque: 0.3 N m
(2.65 lbf in.))
1
Remove 10 mm (0.394 in.) of
insulation coating from the ① Lead
wire.
2
While pressing the ② Orange
button with a precision flathead
screwdriver, insert the lead wire.
After the lead wire is inserted, release
the button to secure the wire.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epc-210-eip

Table of Contents