Rf Calibration; Rf Calibration Equipment Setup; Rf Calibration Procedure - LG L240 Service Manual

Table of Contents

Advertisement

9. RF Calibration

9. RF Calibration

9.1 RF Calibration Equipment Setup

GSM Test Set(8960)
GPIB control
Power Supply
Battery Simulator
PC
PIF
TA

9.2 RF Calibration Procedure

a. Connect as above Fig.
b. Set the power supply voltage about 4.2V
c. Execute HK_23.exe
- 109 -

Advertisement

Table of Contents
loading

This manual is also suitable for:

Me240

Table of Contents