Installation Instructions; Step 1. Prepare For Installation - Tesla Powerwall 2 Installation Manual

Stack kit
Hide thumbs Also See for Powerwall 2:
Table of Contents

Advertisement

Installation Instructions

These instructions assume that at least one Powerwall has already been installed at the site
and that additional Powerwall units are being added. For complete instructions on installing
Powerwall, see the Powerwall 2 AC Installation Manual.

Step 1. Prepare for Installation

1. Turn off the first (previously installed) Powerwall by setting its On/Off switch to the OFF
position.
2. Turn off the AC circuit breaker for the Powerwall.
3. Ensure that the second Powerwall is turned off by verifying that its On/Off switch is set to
the OFF position.
4. Remove both side covers from each Powerwall to be joined:
On the first (previously installed) Powerwall, it may be necessary to remove the small
plastic insert at the bottom of the covers to help with removal.
4
Figure 2: Switching Powerwall Off
Figure 3: Removing the Bottom Insert
Powerwall Stack Kit Installation Manual

Advertisement

Table of Contents
loading

Table of Contents