Download Print this page

2.2 Installation - ProArc PT-103 Owner's Manual

Positioning system and accessories

Advertisement

2.2 INSTALLATION

 Power cord. Connect the power cord to 1 phase 100V~240VAC
Note:The standard power connector is NEMA-5-15P, different region may select different power
connector.
NEMA-5-15P(Standard)
 Grounding Stud
To avoid potential electrical damage, please connect the grounding stud to actual ground.
 Tilt Lock / Release Handle
Clockwise rotation to lock, counter clockwise rotation to release
Danger! Do not release the tilt handle when part is loaded on the faceplate.
(PSW) Power Switch
I = On,O = Off
LED Indicator Color Identification.
Green:Standby.
Red:Stop button activated.
White:Auto-procedure in progress.
Flashing Green:Homing sequence in progress. (CB-102 only)
Flash Red:Overload.
Forward / Reverse Switch (SW1)
Faceplate rotation direction.
CW (
) / CCW (
Reverse
European Adapter(Option)
)
Forward
4
Australian Adapter(Option)

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Pt-203