Tongue Installation - Salford I-1100 Assembly And Parts Manual

Table of Contents

Advertisement

Return to Contents
7
11
12
10
27
28
19
18
16
Used on machines under 31ft.
27
Used on machines 31ft and up.
28
Page 18
MNP870-32-35-16A 2016 870-32ft & 35ft Assembly and Parts Manual Rev A

Tongue Installation

31
13
15
9
14
6
33
35
17
Install clevis in bottom holes for
draw-bars 18-22" high.
For taller draw-bars move clevis
up as required to level machine.
8
5
4
34
NOTE:
includes
32
32
hardware for mounting.
(
,
,
4
33
34
26
OPTIONAL:
CAT 3 CLEVIS
(KCPPI-30XL)
25
Salford Group Inc.
3
1
20
)
21
Torque
220-250 ft/lbs
OPTIONAL
CAT 5 CLEVIS
(KCPPI-53XL)
2
4
22
23
23
24
&
to
22
24
12-2015

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

I-4200

Table of Contents