Remote Monitoring Using Web App - Pyramid 5 KW 3 Phase User & Installation Manual

Three phase grid tied solar inverter
Table of Contents

Advertisement

– Once the last character is reached, that is "c" in this example, the user needs to press
the "Back" button and NOT the "Enter" button as was the case with previous characters.
Pressing the enter button once the last character is reached will lead to an unsuccessful
connection.
User can refer Table 3 on page 18 to get an idea about the sequence of characters available
to enter the password.
ˆ If the entered password is correct then display will show 'WiFi Connected Successfully' and it
will automatically reach the default 'Measurement' loop and start to show the meter readings.
ˆ If WiFi module is unable to connect, then it will try to connect with the GSM as mentioned in
above step.
ˆ User can also take the help of flow chart provided on Figure 3 on page 35.
Note: If the user gets stuck anywhere on display screen, then press 'Back' button to reach the
default 'Measurements?' tab and press 'Enter' to enter the default loop.
7.2

Remote Monitoring Using Web App

The steps for using Web App are as follows:
ˆ Type
www.pyramidsolar.in
ˆ It will open the home page on screen as shown below.
ˆ Now click on 'SignUp Now' and a new page will appear on screen as shown below.
ˆ Enter all the details and click on 'Register' button.
5KW 3-Phase Grid Tied Solar Inverter
in any web browser and hit enter.
© Pyramid Electronics
19

Advertisement

Table of Contents
loading

Related Products for Pyramid 5 KW 3 Phase

Table of Contents