Download Print this page

IBM eServer iSeries 8 Series Manual page 7

Upgrading the system unit from operations console to twinaxial console (5540)

Advertisement

v 825 system unit: C07
v 830, 840, SB2, SB3 system unit: C04, C06, C07, C09, or C10
v 870 or 890 system unit: C04, C06, C07, C08, or C09
__
No: Continue with the next step.
__
Yes: Go to "Connecting the Twinaxial cable attachment and Twinaxial
console cable" on page 5.
__ 5. Before you remove the card from the system unit, you need to see if you
have an open position to install the card you removed in a different
position.
Look at the PCI card area. Are there any open positions?
__
Yes: Go to the Install PCI Card topic in the Information Center for
instructions on Moving a card in your iSeries.
__
No: Use the following to help determine card placement.
– Go to the Install PCI Card topic in the Information Center
– Contact your authorized service provider or your authorized
dealer
__ 6. Attention: Adapter cards are fragile. Use static strap when handling,
handle only by the edges, and keep fingers off printed circuit area.
__ 7. Install the new 2746 adapter card in one of the following positions:
v 270 system unit: C06
v 810 system unit: C07
v 820 system unit: C04 or C11
v 825 system unit: C06
v 830, 840, SB2, SB3 system unit: C04, C06, C07, C09, or C10
v 870 or 890 system unit: C04, C06, C07, C08, or C09
__ 8. Does your unit have screws to secure the cards?
__
No: Continue with the next step.
__
Yes: Remove the screw from the card position where you plan to
install the card.
Upgrade Operations Console to twinaxial console
3

Advertisement

loading

This manual is also suitable for:

Eserver iseries 270