Prepare For Installation; General Precautions - Cisco NCS 540 Hardware Installation Manual

Large density routers
Hide thumbs Also See for NCS 540:
Table of Contents

Advertisement

Prepare for Installation

Before you install the Cisco NCS 540 large density routers, you must prepare your site for installation.
Preparing your site involves these tasks:

General Precautions

Observe the following general precautions when using and working with your router:
• Keep your system components away from radiators and heat sources, and do not block cooling vents.
• Do not spill food or liquids on your system components, and never operate the product in a wet
• Do not push any objects into the openings of your system components. Doing so can cause fire or electric
• Position system cables and power supply cable carefully. Route system cables, the power supply cable,
• Do not modify power cables or plugs. Consult a licensed electrician or your power company for site
Airflow Guidelines, on page 16
Prepare Yourself , on page 22
environment.
shock by shorting out interior components.
and plug so that they are not stepped on or tripped over. Be sure that nothing else rests on your system
component cables or power cable.
modifications. Always follow your local and national wiring rules.
Cisco Network Convergence System 540 Large Density Routers Hardware Installation Guide
3
C H A P T E R
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

N540-24q8l2dd-sys

Table of Contents