Prepare Yourself; Prepare Rack For Chassis Installation - Cisco 8000 Series Prepare For Installation

Hide thumbs Also See for 8000 Series:
Table of Contents

Advertisement

Prepare Yourself

Prepare Yourself
This section illustrates how to prepare yourself before removing the chassis from the sealed antistatic bag.
The figures show how to cuff the ESD strap around the wrist and the ground cord that connects the cuff to
the ground. ESD wrist straps are the primary means of controlling static charge on personnel.
Figure 2: Wearing the ESD Strap

Prepare Rack for Chassis Installation

Install the Cisco 8800 Series Routers on a standard 19 inch, Electronic Industries Alliance (EIA) rack with
mounting rails that conform to English universal hole spacing according to Section 1 of the
ANSI/EIA-310-D-1992 standard.
The spacing between the posts of the rack must be (EIA-310-D-1992 19-inch rack compatible) wide enough
to accommodate the width of the chassis.
Before you move the chassis or mount the chassis into the rack, we recommend that you do the following:
Prepare for Installation
8
Prepare for Installation

Advertisement

Table of Contents
loading

Table of Contents