Download Print this page

Quilt EZ King Quilter II Installation Instructions Manual page 27

Advertisement

Appendix B- Additional help
Installing cables
Please refer to the Connecting Robot to Quilt Machine instruction set for help installing cables.
Power on the robotics
Use the power switch located on the side of the motor box with the ports to power the motor
box off and on.
Disengage belts for free motion
In order to use free mo-
tion with the butler con-
nected the belts will need
to be disengaged.
To disengage the x-belt,
move the locking lever
away from the edge of the
motor box.
To disengage the y-belt,
loosen the wing-nut on
the carriage bracket.
You can now use free
motion quilting.
Page 25

Advertisement

loading

Related Products for Quilt EZ King Quilter II