Download Print this page

Quilt EZ King Quilter II Installation Instructions Manual page 22

Advertisement

5
Use the anchors and
zip-ties from bag Z1
to secure the cables to
the carriage and the
machine in such a way
that they will not be
in the way of moving
parts.
6
Avante:
Remove the handlebar
wires from the
machine.
Plug the handlebar
wires from the machine
into the provided
handlebar cable
adapter.
Plug the adapter with
the handlebar wires
into the machine.
Check Belt Tension
1
Set the machine in the
middle of the frame.
The white belt should
have between 1" and
1.5" of play in the belt.
The black belt should
have approximately
1/4" of play.
Page 20
*Image not representative of frame type.
*Images not representative of frame type.

Advertisement

loading

Related Products for Quilt EZ King Quilter II