Final check and trial operation

To complete the installation, perform the following checks and tests to
ensure that the air conditioner operates correctly.
Check the followings:
• Strength of the installation site
• Tightness of pipe connection to detect gas leak
• Electric wiring connection
• Heat-resistant insulation of the pipe
• Drainage
• Grounding conductor connection
• Correct operation (follow the steps below)
1. Press the Power
button and check the following:
The indicator on the indoor unit lights up.
f 
The airflow blade opens and the fan gears up for operation.
2. Press the Mode button to select Cool or Heat mode.
In Cool mode, use Temp + or - button and set the temperature at 16°C.
f 
In Heat mode, use Temp + or - button and set the temperature at 30°C.
• A pproximately 3~5 minutes later, outdoor unit will start to operate and the Cool or Warm air will blow out.
• A fter 12 minutes of stationary condition check the indoor unit air treatment:
Cooling mode (indoor unit check)  Inlet air temp. - Outlet air temp : From 10°K to 12°K ( indicative delta T)
f
Heating mode (indoor unit check)  Outlet air temp. - Inlet air temp : From 11°K to 14°K (indicative delta T)
In heating mode, the indoor fan motor can remain off to avoid cold air blown into conditioned space.
3. Press the Air swing
The airflow blades work properly.
f 
4. Press the Power
button to stop the operation.
• W hen you complete the installation successfully, hand over this manual to the user for storage in a handy and safe
place.