Download Print this page

Advertisement

Quick Links

Lollipop
Installation
Instalacion

Advertisement

loading
Need help?

Need help?

Do you have a question about the Lollipop and is the answer not in the manual?

Questions and answers

Summary of Contents for FRANZ VIEGENER Lollipop

  • Page 1 Lollipop Installation Instalacion...
  • Page 2 Lollipop Faucets - Line J2-J2L-J2K-J2D-J2R-J2V Before connecting the faucet to the water supply, flush the tubing thoroughly to eliminate any residue / Antes de conectar la grifería a la distribución de agua, purgue muy bien la cañería a fin de eliminar partículas extrañas.
  • Page 3 Lollipop Faucets - Line J2-J2L-J2K-J2D-J2R-J2V FV201/J2-J2L-J2K-J2D-J2R-J2V Widespread lavatory 1/2” Lavatorio. (133,7mm) 5/16” (33mm) 3/8” (35mm) 3/16” (55mm) 5/8” (25mm) 1/2” (63mm) 1/4” (32mm) Minimum flow rate out at required constant pressure, 20 PSI and minimum flow rate for feed from 5.3 gal per min (for hot and cold conections): 2,2 gal per min 3/4"...
  • Page 4 Lollipop Faucets - Line J2-J2L-J2K-J2D-J2R-J2V Handle models Modelos de volante FV201/J2 FV201/J2L FV201/J2K FV201/J2D FV201/J2V FV201/J2R...
  • Page 5 Installation / Instalación...
  • Page 6 Installation / Instalación OPTIONAL Opcional...
  • Page 7 Installation / Instalación Not included / No incluido...
  • Page 8 Installation / Instalación CLOSED OPEN POSITION POSITION Cerrado Abierto...
  • Page 9 / Notas...
  • Page 10 / Notas...
  • Page 11 / Notas...
  • Page 12 Phone 847-244-1234 / Fax 847-244-1259 FRANZ VIEGENER reserve the right to make revisions without notice in the design of faucets and bathroom accessories or in packaging. FOLLFV201/J2 _ Edition N...