Download Print this page

Dell 6350 Rack Installation page 28

Dell poweredge 6350 servers: installation guide
Hide thumbs Also See for 6350:

Advertisement

1-14
Rack Installation Guide
slotted
pocket
  '  + $  *
2.
Insert the free end of the cable-management arm (the end with the captive
thumbscrew) into the slotted pocket (formed from the metal tabs) on the back of
the computer (see Figure 1-11).
3.
Secure the cable-management arm in its slotted pocket with the captive
thumbscrew.
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the computer.
5.
Connect the remaining cables to the computer.
For PowerEdge 6x50 connection details, see your computer's Installation and
Troubleshooting Guide and the User's Guide.
For PowerVault 530F connection details, see your computer's System
Administrator's Guide.
6.
Secure the cables to the cable-management arm.
captive
thumbscrew

Advertisement

loading

This manual is also suitable for:

Powervault 530fPoweredge 6x50