Daikin RXR28EV1B9 Service Manual Removal Procedure page 23

2.8/4.2/5.0 kw class
Hide thumbs Also See for RXR28EV1B9:
Table of Contents

Advertisement

Si00-777
Step
12
Disconnect the 4
connectors.
13
Remove the screw and
detach the earth wire.
14
Detach the clamp for
the thermistor
assembly from the
electrical box.
15
Remove the 2 screws
of the electrical box.
16
Lift the electrical box
and remove it.
Removal Procedure
Procedure
White Red
Black
Green/Yellow
Earth wire
Clamp
Removal of Electrical Box
(R14011)
(R14012)
(R14013)
Electrical box
(R14014)
Points
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxr42ev1b9Rxr50ev1b9Rxr28fvltRxr50fvlt

Table of Contents