Operation; Preparing The Machine For First Use; Break-In Period - Husqvarna CRT48-33K Operator's Manual

Ride-on trowel
Table of Contents

Advertisement

CRT 48-33K
4

Operation

4.1

Preparing the Machine for First Use

1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2

Break-in Period

Overview
New engines require a break-in period to ensure maximum efficiency. During the
break-in period, the internal components of the engine wear slightly and develop a
tight seal.
The engine in this machine has a 50 hour break-in period.
Operating
Follow the recommendations below while operating the machine during the break-
during the
in period.
break-in
Allow the engine to warm up completely before operating the machine in cold
period
weather.
Change the engine oil and oil filter after 50 hours of operation. See topic Engine
Oil and Filter in the "Maintenance" chapter.
wc_tx002045gb.fm
33
Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crt48-33k df

Table of Contents