Pre-Installation and Site Preparation Guide Loring S35 Kestrel Coffee Roaster...
Page 2
Page 2 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 3
This manual, along with other manuals in this series, is intended to be a guideline for the installation and use for the product lines manufactured by Loring Smart Roast, Inc. The customer is responsible for complying with all applicable regulations.
Page 4
• Comply with all applicable rules and regulations and governing agencies. • Loring reserves the right to change information within this document at any time without notice. Page 4 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control.
1006705 Rev B Page 5 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 6
Page 6 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Preparing for and installing a Loring coffee roaster requires cooperation between the customer and Loring over several weeks. Generally, the customer should begin preparing the site 3 months prior to shipping. Upon receiving the roaster, the customer’s general contractor assembles...
Page 8
Welcome Packet. The Welcome Packet contains detailed instructions and information sent • by Loring to each new customer upon purchase of a coffee roaster. One item, the Product Specification Form, must be completed and returned to Loring in order for Loring to begin building the roaster.
Page 9
S35 Pre-Installation and Site Preparation Guide Equipment The core pieces of Loring coffee-roasting equipment are as follows: • S35 coffee roaster • C35 Green Bean Cart (included with S35 roaster) • D35 Destoner (optional) S35 Coffee Roaster D35 Destoner C35 Green...
Page 10 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 11 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
S35 Pre-Installation and Site Preparation Guide Power Specification Loring coffee roasters can be built to accommodate a wide range of electrical configurations. To determine which Loring topology matches your facility’s supply, the customer should engage a licensed electrician to perform a site survey, in order to provide the following information: –...
Page 13
Number of Phases: The Number of Phases represents the number of Line-to-Line phases. • This is either 1P or 3P, indicating single phase or three phase respectively. Wiring Topology: The type of circuit. Refer to Loring Engineering Document No. 1001163 for • more information.
Minimum Ceiling Clearance 12" (31 cm) above Stack Hat Total Ceiling Height 118" (300 cm) Refer to the Mechanical Interface Control Document (MICD) from Loring for further information, including CAD diagrams with construction details. Page 14 of 52 1006705 Rev B Loring Smart Roast Proprietary –...
1006705 Rev B Page 15 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 16 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 17 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 18 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 19 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 20 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 21
1006705 Rev B Page 21 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 22 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 23 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 24
Page 24 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Stack elbow options for routing through existing openings. Check local building codes for additional stack ventilation requirements. Assistance with stack design is available through Loring upon request. Loring recommends engaging with a stack design consultant to create details for complex site configurations.
Generally speaking, the smallest opening for the S35 (crated) 92" (234 cm) tall by 60" (153 cm) wide if the crates are side loaded onto a pallet jack, Heavy End inwards. However, under special circumstances, Loring may be able to suggest further measures to fit a piece of equipment through a tighter space.
1006705 Rev B Page 27 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Refer to local code requirements for the amount of space to allow. Radial stack clearances may differ based on stack manufacturer’s installation requirements. Additional rain proofing measures may be required. Contact Loring for assistance with custom configurations for very low ceilings. Low Clearance Multi-Story Buildings If ceiling is taller than 15 feet, the stacks can go straight up and out of the roof, or they can bend after a certain height and exit the wall instead.
1006705 Rev B Page 29 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 30
Page 30 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 31 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Be sure to state that the roaster is to travel on a vehicle equipped with air ride suspension to dampen the vibration and minimize the chance of damage during shipment. For a cross-country shipment within the United States, Loring will not load the roaster »...
1006705 Rev B Page 33 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 34
Page 34 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 35
1006705 Rev B Page 35 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 36 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 37
1006705 Rev B Page 37 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 38
Page 38 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
S35 Pre-Installation and Site Preparation Guide Next Steps After confirming the shipping date with Loring, the customer should: 1. Review the Assembly and Installation Guide and the Mechanical Interface Control Documents (MICDs), available from Loring. 2. Provide the roaster model’s Pre-Installation Guide, the Assembly and Installation Guide, a copy of the customer’s completed Product Specification Form, and the Mechanical Interface Control...
Gas and Gas Supply Gas Connection Planning Loring roasters can be fueled by either natural or propane gas. The gas supply pressure is the same for each roaster, but the gas volume is different between them. Gas connections to the roaster must be made by a licensed contractor in accordance with all applicable local and regional regulations regarding installations of this type.
S35 Pre-Installation and Site Preparation Guide Propane Installation Specification BTU minimum requirements of the Loring S35 Roaster: Propane must have a minimum of 2500 BTU/FT^3 (93 MJ/m^3) caloric content. • S35 Kestrel requires a 300,000 BTU/hr (76 kCal/h) gas supply Note: These are peak BTU requirements and the average can be less based on usage.
Page 42
2 PSI and the second regulator is set for working pressure of 4” to 7” WC (1.0 kPa to 1.7 kPa). Meter and regulator must be designed to handle BTU load, S35 Kestrel 300,000 BTU/hr (76 kCal/h).
1006705 Rev B Page 43 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 44
Page 44 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 45 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 46
Page 46 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 47
1006705 Rev B Page 47 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 48
Page 48 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
1006705 Rev B Page 49 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 50
Page 50 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 51
1006705 Rev B Page 51 of 52 Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.
Page 52 of 52 1006705 Rev B Loring Smart Roast Proprietary – This document is controlled by Document Control. By printing this document, it will become a “Reference” copy. Users are responsible for verifying that it is the latest revision available.