ABB TPL65-A30 Operation Manual page 67

Hide thumbs Also See for TPL65-A30:
Table of Contents

Advertisement

Operation Manual / TPL65-A10 / -A30
5 Maintenance / 5.5 Cleaning components mechanically
© Copyright 2018 . All rights reserved.
4. When the cartridge group is horizontal, secure one chain block to one
of the upper push-off threads using a swivel lifting eye and suspend
from the second crane.
5. Tighten chain block until entire cartridge group is suspended from
second crane.
6. Remove loop from first crane.
HZTL2482_EN
Revision D
April 2018

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ht843591

Table of Contents