Page 2
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Congratulations on your purchase of a LEO Peripherial Pump It is important that you read, fully understand and observe the following safety precautions and warnings. Careless or improper use of the machine may cause serious or fatal injury. The user is responsible for any accidents involving other people or other people’s property.
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Implementation Standards IEC/EN 60335-1 Household and similar electrical appliances--safety Part1: General requirements. IEC/EN 60335-2-41 Household and similar electrical appliances--safety Part2-41: Particular requirements for pump. 2006/95/EC Low voltage directive Safety Precautions To ensure normal and safety operation of the electric pump, read the manual carefully before use.
Page 5
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Keep the pump in ventilation. In case ambient temperature is lower than 4℃ or the pump is not used for a long time, empty liquid the pipeline system to avoid ice cracking of the pump chamber. Do not operate the pump for a long time without water in it.
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Product Structure POS. Part POS. Part Pump body Impeller End plate Mechanical seal Cable holder Support Cord clip Water proof gland Capacitor Bearing Capacitor box Rotor Terminal board Spring washer Stator Fan cover Filling plug...
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Pipeline Installation This product should be installed and maintained by personnel who is proficient in this manual and has special qualifications. Installation and operation should be in accordance with local regulations and recognized operation standards.
Page 8
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. 1. Foot valve 2. Water tap 3. Outlet pipe 4. Filling plug 5. Electric pump 6. Tie-in 7. Inlet pipe B: Installation precautions for inlet pipelines 1. While installing the electric pump, do not use too soft rubber tube for the inlet pipeline, avoiding to be sucked flat.
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Electrical Connection Unless the power is off, do not wiring the junction box. The electric pump should have reliable grounding to prevent current leakage with leakage protection switch being equipped Electrical connection and protection should be conducted according to stipulations. Specification of working voltage is marked on the nameplate;...
Page 10
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Automatic device (Pressure switch) While using the automatic pump, in case it still operates after turning off the water tap, lower down power cut-off pressure of the pressure switch on the premise of pipeline without leakage, namely, rotate the variable screw nut II in counter clockwise direction (-) to acquire lower closing pressure.
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Start-up and Maintenance Do not start up the pump before the pump chamber is filled with water. Do not touch the electric pump unless its power has been cut off for at least 5 minutes. Do not dismount the pump body unless water in the pump chamber is emptied.
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Troubleshooting Check the pump after power cut-off. Symptom Cause Corrective Action Single-phase power repair switch contact supply (three-phase or replace the switch; electric motor): replace the safety fuse; poor connection of check and tighten the power switch;...
Page 13
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. The inlet pipeline is too long Apply the pipe with the or with too many bends, stipulated diameter, pipe diameter and make the inlet pipe Insufficient pressure selected as required. short. Inlet pipeline, filter screen Clean pipeline, foot or pump chamber...
Acquaer Ltd. H-4900, Fehérgyarmat, Szatmári út 11. Guarantee terms Please carefully retain the guarantee card completed by the seller, or the proof of purchase. Pre-conditions for the 24-month guarantee entitlement: - Deployment of the device solely for private use. The guarantee is reduced to 12 months in the commercial sector or leasing business.