Planet WBS-502AC Quick Installation Manual

Planet WBS-502AC Quick Installation Manual

5ghz 900mbps 802.11ac outdoor wireless cpe
Hide thumbs Also See for WBS-502AC:

Advertisement

Quick Installation Guide
WBS-502AC
5GHz 900Mbps 802.11ac
Outdoor Wireless CPE

1. Package Contents

Thank you for choosing PLANET Outdoor Wireless CPE. Before installing,
please verify the contents inside the package box. The device mentioned
herein is the brief name of the "Outdoor Wireless AP/CPE".
WBS-502AC
Quick Guide
Mounting Ring x 1
Sealing Nut
x 1
Bracket x 1

3. Hardware Installation

Step 1:

(1) Remove the bottom cover.
(2) Connect one end of the Ethernet cable into the LAN (802.3at PoE)
port of the device and the other end to the PoE port on the PoE
Injector.
(3) Connect the power cord with the PoE Injector and plug the other
end into an electrical outlet.
(4) Connect the second Ethernet cable into the LAN port of the PoE
Injector and the other end to the Ethernet port on the computer.
(5) Place the bottom cover back into the device.
1
1
2
4
To PC
PoE Injector & Power Cord
Screw Set x 1
Rubber x 1
Dynamic Stick x 1
– 1 –
2
3
– 3 –
If there is any item missing or damaged, please contact the
seller immediately.
Note
IMPORTANT SAFETY PRECAUTIONS:
1. LIVES MAY BE AT RISK! Please be aware of the
2. Users MUST complete grounding wired with the device;
3. Users MUST use the "PoE Injector and Power Cord"

2. Physical Introduction

Hardware Description

Step 2: Pole Mounting

(1) Put the rubber into the bracket.
(2) Plug the dynamic stick into the bracket.
(3) Screw the sealing nut and assemble parts, and make sure they are
well tightened.
(4) Put the lock washer on the dynamic stick.
(5) Assemble the mounting parts to the device.
(6) Thread the open end of the mounting ring through the tab on the
bracket.
(7) Lock and tighten the mounting ring to secure the bracket to the
pole to finish the installation.
5
electrical wires around. Carefully read the section
"OUTDOOR INSTALLATION WARNING" in the manual
before installation.
otherwise, a sudden lightning could cause fatal damage
to the device. EMD (Lightning) DAMAGE IS NOT
COVERED UNDER WARRANTY.
shipped in the box with the device. Use of other options
will cause damage to the device.
– 2 –
5
3
4
6
– 4 –
Reset Button
LEDs
LAN2 (802.3af PoE Out)
LAN1 (802.3at PoE In)
1
2
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WBS-502AC and is the answer not in the manual?

Questions and answers

Summary of Contents for Planet WBS-502AC

  • Page 1 COVERED UNDER WARRANTY. 3. Users MUST use the “PoE Injector and Power Cord” Thank you for choosing PLANET Outdoor Wireless CPE. Before installing, shipped in the box with the device. Use of other options please verify the contents inside the package box. The device mentioned will cause damage to the device.
  • Page 2 The above steps introduce the simple installations and configurations of the device. For further configurations, please refer to the user manual, which can be downloaded from the website. WBS-502AC: http://www.planet.com.tw/en/support/download.php?ty pe1=4&model=48985&type=3 If you have further questions, please contact the local dealer or distributor where you purchased this product.

Table of Contents