Napoleon L38N Installation Manual page 42

Acies series
Hide thumbs Also See for L38N:
Table of Contents

Advertisement

Available languages

Available languages

finish framing - after appliance installation
EN
single-sided recessed
Ceiling
minimum framing
Ref
K
E
F
J
L
M*
*Can only be increased to 4" max by building a protrusion.
42
W415-1707 / 07.04.17
L
M*
J
F
L38
39 15/16" (101.4cm)
18" (45.7cm)
53 13/16" (136.7cm)
Optional - Appliance does not need to be elevated above floor
74" (188cm)
3" (76mm)
note:
Shaded components (finish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its final position and venting
connected.
This configuration also requires recess
area to use non-combustible facing due
to close proximity to vent.
K
Drywall
E
Insulation
L50
39 15/16" (101.4cm)
18" (45.7cm)
65 13/16" (167.2cm)
74" (188cm)
3" (76mm)

Advertisement

Table of Contents
loading

This manual is also suitable for:

L50nL38n2L50n2L38pL50pL38p2 ... Show all

Table of Contents