Download Print this page

Cisco MDS 9220i Manual page 8

Advertisement

NEBS Compliance
b. Position a front-mount bracket so that four of its screw holes are aligned to the screw holes on the
side of the chassis.
Note
You can align any four of the holes in the front rack-mount bracket to four of the six screw holes on the side
of the chassis. The holes that you use depend on the requirements of your rack and the amount of clearance
required for interface cables (3 in. [76 mm] minimum) and module handles (1 in. [25 mm] minimum).
c. Secure the front-mount bracket to the chassis using the four M4 screws and tighten each screw to 12
in-lb (1.36 N·m) of torque.
d. Repeat Step 1 for the other front rack-mount bracket on the other side of the switch, and be sure to
position that bracket the same distance from the front of the switch.
2. Align the tabs on the NEBS air baffle on the slots on the front rack-mount bracket and snap the NEBS air
baffle into place as shown in
Kit for 4-Post installation, on page
Figure 3: NEBS Kit for 2-Post installation
Installing the Cisco MDS 9220i Switch
8
Figure 3: NEBS Kit for 2-Post installation, on page 8
9.
Installing the Cisco MDS 9220i Switch
or
Figure 4: NEBS

Advertisement

loading