Mounting Kit - CDVI BO800RN Installation Manual

Retrofit housing and retrofit handles
Hide thumbs Also See for BO800RN:
Table of Contents

Advertisement

Available languages

Available languages

iNstaLLatiON MaNUaL
BO800RN
Retrofit housing and retrofit handles

3] MOUNtiNG Kit

Profiled
handle with
end caps
BO800RN
PBO400RN40
PBO800RN60
4] assEMBLY
Before commencing assembly, ensure you have the correct tools and accessories
depending on the installation.
1
(x4)
(x2)
Position the box-section backplate,
complete
with
pre-fitted
magnetic locks, on to the door frame
(or fixed door leaf if installing onto
double doors) – ensure the positioning
will allow for the archi-tectural handle
to close securely over the section. Once
you are satisfied with the position,
mark the vertical and horizontal
holes, then drill as required. Take note
of the cable entry holes, and feed
the cables through. Fix the section into
place, then wire the electromagnetic
locks in accordance with the wiring
schematic in Section 5. Fit the box
section cover into place, fir the end
caps and secure with the M4 screws
provided.
4
cdvigroup.com
Profiled
handle
Box section
fixings
back-plate
cover
1
1
1
1
1
1
2
(x2)
With the door closed, position the
electro-
architectural handle onto the edge of
the opening leaf of the door, ensuring
the handle covers the box-section. Mark
the vertical and horizontal holes, drill
as required, then temporarily fix the
handle leaving a small gap around the
box section – check the alignment of
the magnets in the box section with the
magnets in the handle.
Adjust if necessary, then once satisfied,
secure the handle by completing
the fixings.
Box section
End caps
cover
1
1
1
1
1
1
screws kit
2
1
2
1
2
1
3
To finalise the assembly, tighten all
fixings, and protect the handle fixing
section by fitting the cover and end caps.
EN
Manual
1
1
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bo1200rnPbo800rn60Pbo400rn40

Table of Contents