TS200 Series Tripod Turnstile
2

Unpacking and Testing the Tripod Turnstile

Arm Installation

In order to prevent the arm from damaging during transportation, the arm will not be initially
installed to the devices.
Installation procedure
Put the arm kit into the hole of cabinet; make sure the screw holes match with mechanism core, then
tighten 3 hex screws, as shown in Figure 2-1.

Power-on Test before Installation

1.
Please make sure that the power requirements are strictly met to avoid permanent damages to
the unit. Input voltage: AC 100~120V /200~240V.
Note: The tripod turnstile must be connected to the ground (earth).
2.
Power on and wait 30s for the tripod turnstile to finish the self-check program.
3.
Lift the arms manually, as shown in Figure 2-2.
4.
Check whether the tripod turnstile and the LED indicators work properly.
If there is any problem, please contact the supplier.
Earth wiring terminal
P a g e
| 5
Figure 2-1
There is a power
switch in the side
direction of this
power supply.
User Manual
Lift upwards

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TS200 Series and is the answer not in the manual?

Questions and answers

Table of Contents