Before Assembly
Please open the package carefully, and check if there are any damaged or lost parts.
We should have:
A
Main reactor body and lid
B
Pump ( T-1 / T-2 / T-3 with baffle )
C
Inlet filter (with hose and pinch valve) / bubble counter (with hose) / holder
D
Hose (inlet/outlet) / hose holder
While we take great care to keep any contaminants away from our products during assembly, please take a moment to clean with warm water ONLY.
Never clean Acrylic with alcohol-based products or other chemicals. Use caution when handling acrylic scratches easily.
Assembly
1
Loosen the thumb screws. Turn lid counterclockwise to release.
Fill in your media, but watch out not to fill into the central tube. You can temporarily block the top of the central tube to stop additives from going down the central tube.
2
Once you finished filling, make sure the o-ring is in the groove, then place the lid, and screw back. (DO NOT OVER-TIGHTEN)
3
Remember to leave one screw to install the inlet holder.
cTech T-Series
Calcium Reactor T-Nano / T-1 / T-2 / T-3
B
D
A
C
Tips: Tighten the screws in a star pattern to evenly secure the lid.
www.aquamaxxaquariums.com
info@aquamaxxaquariums.com
Additional Parts Needed (sold separately)
• Feeding Pump
• Calcium Reactor Media
• CO2 Cylinder
• CO2 Check Valve
• CO2 Regulator
• CO2 Tubing
• pH test kit, pH monitor or pH controller
Wash your media before you use them.
Leave at least 50mm from media to lid.
Need help?
Do you have a question about the cTech T Series and is the answer not in the manual?
Questions and answers