Drain Installation; Pre Start Checklist - Hussmann CSS13-2SV-1W Installation And Maintenance Instructions Manual

Combination service cabinet range
Table of Contents

Advertisement

CS Cabinet Range

Drain Installation

Points to be aware of for cabinet drain installation:
 The cabinet should be correctly levelled,
 Water traps are provided for every drain outlet on the cabinet, traps should be fitted as
soon as practicable after the waste outlet.
 The installer should ensure that the drain then slopes to any drainage point.
 Drains may need insulating due to local conditions to prevent condensation dripping onto
the floor.
Pre-Start Checklist
It is suggested that the following items be included but not limited to any pre-start check of this
cabinet.
 All electrical connections are secure and electrical tests completed.
 Refrigeration system has been pressure tested.
 Drain traps have been primed with water to seal and drain screens are fitted where
provided.
 Any loose material created during installation has been cleaned from the cabinet. Pay
attention to filings that may be caught under the evaporator and fan panel seal. These
could cause rust spots and pitting that could permanently damage the stainless steel.
 All electrical, refrigeration and sensor penetrations have been sealed inside and outside
the cabinet. Including any penetrations through baffles or other internal panels
 All safety guards are correctly fitted.
 Fan panels seal correctly.
 Any components removed for installation have been refitted.
All drains should be 40mm or bushed to 40mm as soon as
Any condensate and waste drains must be installed to local
--------------------------------------------------------------------------------------------------
NOTE
practicable after the water trap
NOTE
regulation requirements
/ŶƐƚĂů ů ĂƟŽŶ D ĂŶƵĂů
33

Advertisement

Table of Contents
loading

Table of Contents