Schedule A Report To Run - 8e6 Technologies Enterprise Reporter ER HL/SL Evaluation Manual

Enterprise reporter
Table of Contents

Advertisement

C
ONFIGURE

Schedule a report to run

Once a report view has been saved, it can be scheduled to run at a designated
time.
To schedule a report to run:
1. Go to the Settings menu in the navigation panel and select Event Schedule. The
Event Schedule option is used for maintaining a schedule for generating a
customized report.
Event Schedule window (administrator login)
If logged in as the administrator, all scheduled events display. If logged in as a
manager, only the events scheduled by that manager login ID display. If the
Web Client Scheduler is turned off, the message "To view event schedules,
please enable Web Client scheduler using ER Admin GUI." displays in place of
scheduled events.
2. In the Event Schedule window, click the Add Event button to open the Add
Event to Schedule dialog box:
Add an Event
3. Enter a Name for the event.
8
6 T
, E
R
E
ECHNOLOGIES
NTERPRISE
, T
E
EST THE
NTERPRISE
E
G
EPORTER
VALUATION
UIDE
R
C
C
EPORTER
REATE A
USTOM
R
EPORT FOR A SPECIFIC USER
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Er hlEr sl

Table of Contents