Advertisement

QUBICAAMF Europe
Bologna - ITALY
Phone: +39 051 - 4192611
Fax: +39 051 - 4192602
web: www.QubicaAMF.com
e-mail: mailbox@QubicaAMF.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Bowler Entertainment System and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for QubicaAMF Bowler Entertainment System

  • Page 1 QUBICAAMF Europe Bologna - ITALY Phone: +39 051 - 4192611 Fax: +39 051 - 4192602 web: www.QubicaAMF.com e-mail: mailbox@QubicaAMF.com...
  • Page 2: Table Of Contents

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual TABLE OF CONTENTS General Installation Notes............. 4 Electrical Requirements............. 5 System Components ................5 A.1.1 RDB Graphic Unit ....................5 A.1.2 RDB Graphic Unit with LCD Consoles ..............5 A.1.3 RDB Network......................5 A.1.4...
  • Page 3 B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Table B5 - Overhead Monitors..................24 Table B6 - Overhead Monitors with Fly Console ............25 Table B7 - Overhead Monitors with Micro II Console ..........26 Table B8 - Overhead Monitors with Micro I Console..........27 Table B9 - Overhead Monitors with Single LCD Console..........
  • Page 4: General Installation Notes

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual General Installation Notes For devices directly connected to the power, it is necessary to check that the electrical capacity of the system is suitable for the maximum power requirements of the equipment (as indicated in the labels on the back of the equipment).
  • Page 5: Electrical Requirements

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Electrical Requirements The bowling center proprietor is responsible for the materials and installation of all AC and grounding requirements. All electrical installations must conform to all local and state codes, statutes or standards defined by local jurisdiction and/or inspections.
  • Page 6: Front Desk Computer

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual US Only - Three wire circuit with continuous insulated third wire (Green) equipment ground connecting to the service entrance positive earth ground for each group of four lanes is required. Use no wire smaller than number 12 AWG - 2 mm Ø , rated at 600 Volts.
  • Page 7: Tmr - Foul Lights

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual A.1.8 TMR - Foul Lights A dedicated 120V 20A - 240V 10A 50/60 Hz circuit is required for each group of 8 lanes (4 pairs of lanes). Use no wire smaller than number 12 AWG - 2 mm Ø , rated at 600 Volts.
  • Page 8: Suggested Ground Connection

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Suggested Ground Connection Preface: The recommended electric plant for the score is one based on one and only one ground to which are connected all the ground circuits of the plant (Front desk, Over Head Monitors, RDB etc...).
  • Page 9 B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual To avoid this kind of problem the installations MUST always have ground points 2 and 3 connected together as illustrated in the following diagram. However, in the case of very strong disturbances between points 1 and 2+3, disturbances could still appear on the monitors.
  • Page 10: Solution 1: Isolated Chains

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual • Turn on the monitor and the RDB. • If is all right go to step Communication cable connection. • If there are still problems, the following two solutions are advised Solution 1: Isolated chains Isolating the chains of the metal structure one obtains a separation of grounds 1 and 2+3.
  • Page 11: Section A - Tables

    INDICATIVE POWER CONSUMPTIONS SINGLE OVERHEAD MONITOR: MAX 100W (INRUSH CURRENT : 20A - 120V / 10A - 220V) RDB GRAPHIC UNIT: MAX 100W (INRUSH CURRENT: 20A - 120V / 10A - 220V) FRONT DESK OR BACK OFFICE COMPUTER: MAX 400W (INRUSH CURRENT: 20A - 120V / 10A - 220V) RDB NETWORK HUB:...
  • Page 12 INDICATIVE POWER CONSUMPTIONS SINGLE OVERHEAD MONITOR: MAX 100W (INRUSH CURRENT : 20A - 120V / 10A - 220V) RDB GRAPHIC UNIT: MAX 100W (INRUSH CURRENT: 20A - 120V / 10A - 220V) FRONT DESK OR BACK OFFICE COMPUTER: MAX 400W (INRUSH CURRENT: 20A - 120V / 10A - 220V) RDB NETWORK HUB:...
  • Page 13 INDICATIVE POWER CONSUMPTIONS : FRONT DESK PC: MAX 400W ( INRUSH CURRENT: 20A - 120V / 10A - 220V) Front Desk Optional Desk Back Office POWER SOURCE TO ADDITIONAL STATION B.E.S. Pre-Installation Front Desk and Back Office Table A3 March 2007...
  • Page 14 INDICATIVE POWER CONSUMPTIONS : a l l BUMPER INTERFACE: r t a ( INRUSH CURRENT: 20A - 120V / 10A - 220V) Bumper Interface AIR COMPRESSOR: ( INRUSH CURRENT : 20A - 120V / 10A - 220V) Bumper Interface Transformer supplied by Qubica (1 transformer for 24 lanes) Air Compressor...
  • Page 15 INDICATIVE POWER CONSUMPTIONS : a l l FOUL LIGHT: r t a ( INRUSH CURRENT: 20A - 120V / 10A - 220V) Each transformer serves 8 lanes (4 pairs) POWER SOURCE TO NEXT FOUL LIGHT UNITS TRANSFORMERS B.E.S. Pre-Installation QBK-TMR Foul Line Table A5 March 2007...
  • Page 16 INDICATIVE POWER CONSUMPTIONS a l l TCS Q-DAC: r t a MAX 100W (INRUSH CURRENT : 20A - 120V / 10A - 220V) POWER SOURCE B.E.S. Pre-Installation TCS Q-DAC Table A6 March 2007...
  • Page 17 INDICATIVE POWER CONSUMPTIONS a l l Q-COM Q-DAC: r t a MAX 100W (INRUSH CURRENT : 20A - 120V / 10A - 220V) POWER SOURCE B.E.S. Pre-Installation Q-COM Q-DAC Table A7 March 2007...
  • Page 18: Communications

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Communications RDB Unit Network Connections RDB units operate on a standard network, made of standard network cables and a network hub. RDB units are connected through a Main RDB Network Switch, that links all the RDB units together with the second network card of the Front Desk PC.
  • Page 19: Front Desk Network Connections

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Front Desk Network Connections The connection between the RDB Network and the Front Desk PC is made through a standard network cable. The cable goes from the main RDB Switch to the second network card installed on the Front Desk PC.
  • Page 20: Section B - Tables

    a l l 2" PVC r t a Conduit Electrical Conduit along the Curtain Wall Pinspotter 2" PVC Conduit Tvision Overhead Monitors Foul Light 2" PVC Conduit Console 2" PVC Audio-Video Conduit Source Back Office B.E.S. Pre-Installation Communication Front Desk Conduits Table B1 March 2007...
  • Page 21 2" PVC Conduit Slave Main RDB Switch RDB Switch Slave RDB Switch 2" PVC Conduit Front Desk Audio-Video Source B.E.S. Pre-Installation Conduits for Separated Groups Table B2 March 2007...
  • Page 22 S W I T R D B M A I N POWER SOURCE 8 2 f t 8 2 f t 6 5 . 6 f 4 9 . 2 f 3 2 . 8 f 3 2 . 8 f 9 .
  • Page 23 POWER MAIN SOURCE RDB SWITCH POWER SLAVE SOURCE RDB SWITCH FRONT DESK Terminal 1 POWER SLAVE SOURCE RDB SWITCH B.E.S. Pre-Installation RDB Network with more than 30 lanes Table B4 March 2007...
  • Page 24 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 25 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 26 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 27 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 28 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 29 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 30 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 31 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 32 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t R D B P i n n t e r f c - V I...
  • Page 33 Monitor Cables Green Blue B M a T o R D i t c h r k S w N e t w o O u A u d i V i d O u t X - R X - R R D B P i n n t e...
  • Page 34: Structural Requirements

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual Structural Requirements C.1.1 RDB Graphic Unit The RDB graphic unit is mounted on the curtain wall, centered between each pair of pinspotters. The curtain wall will have to support a load of 35 Lbs – 16 Kg above each pair of pinspotters.
  • Page 35: Front Desk Pc

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual C.1.5 Front Desk PC C.1.6 Micro Console Copyright 2007 Qubica S.p.A. March 2007 – rev. 2B...
  • Page 36: Fly Console

    B.E.S. - BOWLER ENTERTAINMENT SYSTEM Pre-Installation Manual C.1.7 Fly Console C.1.8 LCD Arch Console Copyright 2007 Qubica S.p.A. March 2007 – rev. 2B...
  • Page 37 52.36" - 1330mm 300 Lbs 300 Lbs BACK FRONT 136 Kg 136 Kg 10.24" - 260mm 11.42" - 290mm 34.80" - 884mm 36.06" - 916mm 42.04" - 1068mm 43.39" - 1102mm 47.95" - 1218mm 56.69" - 1440mm 3rd POINT SAFETY CHAIN REQUESTED B.E.S.
  • Page 38 85.82" - 2180mm 400 Lbs 400 Lbs BACK FRONT 10.23" 11.42" 260mm 290mm 182 Kg 182 Kg 34.80" - 884mm 36.14" - 918mm 42.04" - 1068mm 43.39" - 1102mm 47.95" - 1218mm 53.86" - 1368mm 59.76" - 1518mm 65.67" - 1668mm 71.57"...
  • Page 39 63" - 1600mm 450 Lbs 450 Lbs 204 Kg 204 Kg BACK 13" 14.17" FRONT 330mm 360mm 34.80" - 884mm 36.14" - 918mm 42.05" - 1068mm 43.62" - 1108mm 47.95" - 1218mm 53.86" - 1368mm 59.76" - 1518mm 68.11" - 1730mm 3rd POINT SAFETY CHAIN...
  • Page 40 103.15" - 2620mm 675 Lbs 675 Lbs BACK 306 Kg 306 Kg FRONT 13" 14.17" 330mm 360mm 41.38" - 1051mm 43.39" - 1102mm 47.95" - 1218mm 53.86" - 1368mm 59.76" - 1518mm 65.67" - 1668mm 71.57" - 1818mm 77.48" - 1968mm 83.39"...
  • Page 41 73.23" - 1860mm 700 Lbs 700 Lbs 318 Kg 318 Kg BACK 14.60" 14.97" FRONT 371mm 380mm 34.80" - 884mm 36.14" - 918mm 42.05" - 1068mm 43.62" - 1108mm 47.95" - 1218mm 53.86" - 1368mm 59.76" - 1518mm 65.91" - 1674mm 79.53"...
  • Page 42 3rd POINT SAFETY CHAIN REQUESTED ANGLE ADJUSTMENT CHAINS ARE NOT SUPPLIED BY QUBICA B.E.S. Pre-Installation OR POST INSTALLATION SERVICE DUTIES PLEASE ALLOW Monitor Assembler SUFFICIENT GAP ABOVE MONITORS FOR SERVICE PERSONNEL Installation Table C6 March 2007...
  • Page 43 300 Lbs 300 Lbs 136 Kg 136 Kg B.E.S. Pre-Installation Double Plasma Screens Table C7 March 2007...
  • Page 44 36 11/16 [931] MAX 36 11/16 [931] MAX 45 7/16 [1154] 45 7/16 [1154] 28 13/16 [732] MIN 28 13/16 [732] MIN SPECIFICATION: SPECIFICATION: -FRAME WEIGHT 3TV: 185Lb [84Kg] -FRAME WEIGHT 3TV: 185Lb [84Kg] -MAX WEIGHT CAPACITY: 170Lb [77Kg.] PER TV -MAX WEIGHT CAPACITY: 170Lb [77Kg.] PER TV 6 HOOK 6 HOOK...

This manual is also suitable for:

Bes

Table of Contents