Safety And Health - Daikin JEHBSCU0200M1 Technical Manual

Condensing unit for medium/low temperature application
Table of Contents

Advertisement

8. Safety and Health

Only qualified specialists could carry out the installation, maintenance and
commissioning of the system. To avoid potential injury, use care when working
around coil surfaces or sharp edges of metal cabinets. All piping and electrical
wiring should be installed in accordance with all applicable codes, ordinances and
local by-laws.
General Information
Before Installation
Ensure the units received are the correct models for the intended application.
Ensure the refrigerant, voltage and MWP are all suitable for the proposed application.
Check there is no damage to the units. Any damage should be advised to the supplier immediately.
Check that the proposed equipment locations are suitable and provide adequate support for the
weight of the units.
During Installation and subsequent maintenance
Installation and maintenance are to be performed only by qualified personnel who are familiar with
local codes and regulations, and experienced with this type of equipment.
The condensing unit is delivered with a protective nitrogen holding charge.
If lifting equipment is required, ensure that it is suitable for purpose, certificated and that the
operatives are qualified to use it.
Safe working methods are identified and operatives have suitable Personal Protective Equipment
(PPE).
Ensure the working area has adequate ventilation during brazing procedures.
The units contain moving machinery and electrical power hazards, which may cause severe injury
or death. Disconnect and shut off power before installation or service of the equipment.
Refrigerant release into the atmosphere is illegal. Proper evacuation, recovery, handling and leak
testing procedures must be observed at all times.
Units must be earthed and no maintenance work should be attempted prior to disconnecting the
electrical supply.
The electrical covers and fan guards must remain fitted at all times.
Use of the units outside of the design conditions and the application for which the units were
intended may be unsafe and be detrimental to the units, regardless of short or long term operation.
The condensing units are not designed to withstand loads or stresses from other equipment or
personnel. Such extraneous loads or stress may cause failure/leak/injury.
In some circumstances, a suction accumulator (not supplied) may be required. It offers protection
against refrigerant flood back during operation and also against off-cycle migration by adding
internal free volume to the low side of the system.
Tests must be conducted to ensure the amount of off-cycle migration to the compressor does not
exceed the compressor's charge limit.
Wherever possible the system should be installed to utilize a pump down configuration.
After installation, the system should be allowed to run for 3 – 4 hours. Additional oil should be
added as necessary depending on length of pipe run. It should then be rechecked after 24 hours
once the system has stabilized. For details of the oil requirements, please refer to page 33 in the
service and maintenance section.
T-CU01-MAR21-3
Important Note
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents