Sharp VC-MH80 Service Manual page 30

Table of Contents

Advertisement

the connection gear, slow
brake an 3
loading motor assemblies (on
the back of the mechanism chassis).
(1) Assemble the connect gear.
(2) Assemble the slow brake.
(3) Assemble the loading motor unit.
Before setting up the loading motor, make sure the
phase is matched. To do so, turn the connection
gear clockwise and check to see if the loading is
complete and if the pinch roller comes into contact.
Note:
Let the slow brake leg out of the' front of the
mechanism chassis. Catch the spring to the take-up
fixing guide that is at the left of the A/C head.
Brake
Figure 4-50.
When these actions are made smoothly, return the
mechanism
mount the loading motor unit.
30
the
as shown above.
to
state
1
0
Finally

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vc-mh90

Table of Contents