Sharp VC-MH80 Service Manual page 28

Table of Contents

Advertisement

mechanism chassis).
Capstan
Reel Pulley
(Bottom Side of mechanism chassis)
Drum
C u t W a s h e r
Point 0
insert
0
Point 0
Point 0
1. Make sure that the loading gear is at the point
(1) as shown below.
2. Place the shifter in position, keeping in mind the
7 insertion points and the five relief points.
3. For the phase matching at the insertion point (l),
see the point (2) as shown below.
4. Finally fix the shifter with two washers located
on insert points 0 and 6).
P h a s e - M a t c h i n g !
Point 8
Insert
Point 0
Point@
28
Cut Washer
I
Release
Point 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vc-mh90

Table of Contents