Download Print this page

Toshiba SHRM R410A Quick Reference page 55

Hide thumbs Also See for SHRM R410A:

Advertisement

(3) Single fan test operation function
This function is provided to change collectively the mode of all the indoor units connected to the same system for
the fan test operation mode by using switches on the interface P.C. board of the header unit.
<Operation procedure>
Power ON
Match [SW01/SW02/SW03] on the interface P.C.board of the header
unit to [2/5/1]. (7-segment display [A] changes to [F. ].)
Push the push switch SW4 for 2 seconds or more on the P.C. board.
[Test run] is displayed on the remote controller of
the indoor unit to be operated. Check that
7-segment display [B] on the interface P.C. board
of the header unit changed to [– C]
Return [SW01/SW02/Sw03] on the interface P.C. board of the header
unit to [1/1/1].
or push the push switch [SW05] for 2 seconds or more.
NOTE)
The test operation ends after 60 minutes and the operation returns to normal status.
Be sure to turn on power of the indoor unit
and then turn on power supplies at outdoor unit side.
A
B
[
]
[
]
[F.
]
[
F]
7-segment display [A]
SW04
SW01
SW02
<Rotary switches>
Operation
Operation check
Stop/End
7-segment display [B]
SW05
SW03
54

Advertisement

loading